Over the past decade, HydroChina Zhongnan has been focusing on the field of water resources and hydropower, and therefore, has made great achievements in such a field and established itself outstanding reputation. Now, hydroelectric resource planning is one of the key competences of HydroChina Zhongnan. Since the 21st century, the planning and design business of HydroChina Zhongnan has extended from hydroelectric planning only to a variety of fields including integrated river basin planning, flood control and drought resisting planning, site selec_tion and planning for pumped storage power station and planning for tidal energy utilization.

1、Conventional Hydropower

Since the beginning of new China, HydroChina Zhongnan has began its work in hydroelectric resources planning including river resources survey, general investigation on hydroelectric resources and hydroelectric planning and design. It successively finished the general investigation, planning and design for 180 large- or medium-sized rivers (main streams and branches with an area more than 1000km 2) in such provinces (autonomous regions, municipalities directly under the Central Government) as Hunan, Hubei, Jiangxi, Guangdong, Guangxi, Guizhou, Hainan, and Chongqing, including the hydroelectric planning at the middle reaches of Jinsha River, main stream cascade of Yuan River, Daning River Cascade and Youshui River as well as the re-check of a number of large- or medium-sized river planning. Altogether, HydroChina Zhongnan has planned and designed more than 200 hydropower stations with a total installed capacity of 50,000 MW.

Since the year 2006 when HydroChina Zhongnan put forward its operational strategy of “Go west, go abroad and transform”, the hydroelectric resource planning has steadfastly moving towards west China and the global market with breakthrough improvement made as follows: Dongwang River cascade planning in Yunnan Province and Nanla River cascade planning in Myanmar has been accomplished; currently, river planning of Tengtiao River in Yunnan Province, Chabuqu River and Xibaxiaqu River in Tibet, comprehensive planning of Magdalena River in Republic of Colombia and flood control and drought resisting planning for Menam Valley in Thiland are underway.

2、Pumped Storage

HydroChina Zhongnan has its pumped storage power station planning started in early 90’s in the last century. Now, it has a scope of planning covering 5 provinces and 1 city within the service area of Central China Grid and 5 provinces within the service area of China Southern Power Grid. The already finished work for site selec_tion is mainly as follows: site selec_tion planning in provinces like Hunan, Hubei, Chongqing, Henan and Hainan, supplementary site selec_tion for large-scale PSPS in Southern Jiangsu and site selec_tion of PSPS in Guangdong province carried out jointly by HydroChina Zhongnan, Guangdong Electric Power Design Institute and Guangdong Hydropower Planning and Design Institute.

List of HydroChina Zhongnan Planned and Designed PSPSs

No.

Name

Installed Capacity

Description

No.

Name

Installed Capacity

Description

1

Tiantang

70MM

Existing

12

Huangmei

1200MW

Pre-feasibility study

2

Bailianhe

1200MW

Existing

13

Damushan

1200MW

Pre-feasibility study

3

Heimifeng

1200MW

Existing

14

Shangjinshan

1200MW

Pre-feasibility study

4

Liyang

1500MW

Under construction

15

Ziyunshan

1200MW

Pre-feasibility study

5

Qiongzhong

600MW

Under construction

16

Huayuangou

1200MW

Pre-feasibility study

6

Tianchi

1200MW

Feasibility study

17

Luoning

1200MW

Pre-feasibility study

7

Wuyue

1200MW

Feasibility study

18

Wuyue

1000MW

Pre-feasibility study

8

Panlong

1200MW

Feasibility study

19

Anhua

1200MW

Pre-feasibility study

9

Meizhou

2400MW

Feasibility study

20

Pingjiang

1200MW

Pre-feasibility study

10

Dongjiang

510MW

Feasibility study

21

Lianyungang

1200MW

Pre-feasibility study

11

Yunyang

1200MW

Pre-feasibility study