Since 1991, we have made gratifying achievements in survey and design, risk assessment, ecological restoration and EPC contracting for geological disaster control projects. We have accomplished the survey, design and deformation monitoring for treatment of landslides, collapse, mud flow and high slopes for the Three Gorges, Xiaodongjiang, Fengtan, Sanbanxi, Huanglongtan and Xiangjiaba hydropower projects, geological disaster risk assessment of construction land and a series of ecological restoration and recovery works for over one hundred hydropower, pumped storage, and wind power projects such as Xiangjiaba, Baishi and Yutang HPPs, Bailianhe, Heimifeng, Meizhou and Qiongzhong PSPS, and Huitengliang and Luhejin wind farms. The successful implementation of the Right Abutment Slope Treatment Project for Huanglongtan Dam and the Newly Added Works for Right Abutment Treatment of Huanglongtan Power Plant in 2011 marked a new breakthrough in EPC contracting for geological disaster control projects and has laid a good foundation for further broadening our business scope and searching new economic growth point. Currently, we have obtained three Class A qualification certificates for survey, design and risk assessment of geological disaster control projects. Through the training in practice, a large number of professional talents have stood out, and that has greatly enhanced our overall strength in geological disaster control.

Photos of major geological disaster control and ecological environment restoration projects we conducted


Pilot greening and treatment project for high and steep slopes of quarry for Shenzhen Airport.
A technology of grooving on rock faces and planting veins was adopted for greening on rock slope surface, and the practice has provided a reference in exposed mountain treatment for Shenzhen Municipality.



Survey and design for hillside geological disaster control project at the back of Jiumen Village, Humen Town, Dongguan City
Paving mud and planting grass sods and bushes in the lattices while cutting the slope to reduce load and ensure slope stability successfully controlled the geological disaster and beautified the environment.



Survey and design for 53 high cutting slopes of Lot 8 (Lot 1 for Wanzhou District) of High Cutting Slope Protection Project of Chongqing Municipality in Three Gorges Reservoir Area
The photo above shows the high cutting slope at Cuijin Road of Longbao District, and the photo below shows the loosened rock mass of the high cutting slope at east section of Linjiang Road of Wuling Town in Longbao District




Design of Xiaonanshan Quarry Treatment Project in Shenzhen
A manner of treatment from top to bottom and layered steps was adopted, following the principle of bushes and shrubs are preferential in combination with vines and grasses. Large-scale safety production of open quarry and timely ecological environment restoration were realized.



Geological disaster risk assessment for southeast slope of Huaxi Architectural Decoration Company Shenzhen Branch in Jiangong Village, Nanshan District, Shenzhen



Comprehensive geological environment treatment design for Yuanyu Quarry in Nanshan District, Shenzhen



Slope treatment design and deformation monitoring for Sanbanxi reservoir area



EPC contracting for right abutment slope treatment project for Huanglongtan Dam



Survey and design for slope treatment for Group 2 of Tangfang Village in Xiangjiaba reservoir area



Survey and design for Changmeihao landslide treatment in Xiangjiaba reservoir area



Survey and design for Zhaojiawan landslide treatment in Xiangjiaba reservoir area



Survey and design for Halaowo landslide treatment of Dongyuemiao in Xiangjiaba reservoir area



Survey and design for slope treatment at Yongshan Cement Plant in Xiangjiaba reservoir area


Survey and design for treatment of dangerous rocks on slope at access road to Dongjiang HPP


Survey and design for treatment of dangerous rocks on slope at access road to Dongjiang HPP


Geological disaster risk assessment for Baishi HPP in Guizhou (Grade I assessment)


Geological disaster risk assessment for Taoyuan Reservoir at Guiyang in Hunan (Grade I assessment)





Geological disaster risk assessment for Heimifeng PSPS in Hunan (Grade II assessment)



Geological disaster risk assessment for Qiongzhong PSPS in Hainan (Grade I assessment)


Geological disaster risk assessment for Meizhou PSPS (Grade I assessment)


Luhejin Wind Farm at Guiyang of Chenzhou, installed capacity 2MW24
Geological disaster risk assessment: Grade II


Qiaoshi Wind Farm at Guiyang of Chenzhou, installed capacity 2MW24
Geological disaster risk assessment: Grade I


Laixi Wind Farm at Guiyang of Chenzhou, installed capacity 2MW14
Geological disaster risk assessment: Grade I


Huitengliang Wind Farm in Inner Mongolia, a 300MW wind power concession project, installed capacity 1.5MW200
Geological disaster risk assessment: Grade I


Zijingshan Wind Farm at Xupu of Huaihua, installed capacity 2MW24
Geological disaster risk assessment: Grade II


Taohuashan Wind Farm at Huarong of Yueyang, installed capacity 2MW25
Geological disaster risk assessment: Grade II


Shilipingtan Wind Farm at Chengbu of Shaoyang, installed capacity 2MW24+1.9MW1
Geological disaster risk assessment: Grade II


Shiwangutian Wind Farm at Chengbu of Shaoyang, installed capacity 2MW24+1.9MW1
Geological disaster risk assessment: Grade II


Shijiaping Wind Farm at Chengbu of Shaoyang, installed capacity 2MW24+1.5MW1
Geological disaster risk assessment: Grade II


Principal Achievements in the Last Three Years

No.

Type

Time

Descriptions

Design Quality/ Grade of Assessment

1

Geological disaster investigation

Jan. 2009

Geological investigation for geological disaster and risk-avoiding resettlement for Dongjiang Reservoir

Excellent

Jan. 2009

Geological investigation for reservoir bank slope deformation for Guazhi HPP

Good

Feb. 2009

Geological investigation for landslides and bank collapse for Tuokou Reservoir

Excellent

Apr. 2009

Check geological investigation for landslides and bank collapse for Baishi Reservoir (implementation plan)

Good

May 2009

Preliminary investigation for geological disaster control of the area downstream of dam site for Jiangpinghe HPP on the Loushui River in Hubei

Excellent

June 2009

Geological investigation for landslides (Stake no. K20+660~880) for Anbian-Loudong highway restoration project in reservoir area

Good

June 2009

Geological investigation for landslides (Stake no. K8+370~560) for Anbian-Loudong highway restoration project in reservoir area

Good

June 2009

Geological investigation for landslides (Stake no. K20+660~880) for Anbian-Loudong highway restoration project in reservoir area

Good

Sept. 2009

Supplementary geological investigation for reservoir bank slopes of relocated site of Mingjian Town for Baishi HPP

Good

Sept. 2009

Geological investigation for high cutting slopes of relocated site of Jinping Town at Pingshan County in Sichuan in Xiangjiaba reservoir area

Good

Dec. 2009

Geological investigation for landslide at relocated site of Xintan Town hospital at Suijiang County in Yunnan in reservoir area

Excellent

Apr. 2010

Geological investigation for reservoir bank slope deformation for Sanbanxi HPP

Good

Apr. 2010

Geological investigation for reservoir bank slope deformation for Guazhi HPP

Good

May 2010

Geological investigation for potential sliding mass at K25+800 of Lou’an Highway at Pingshan County in Sichuan

Good

July 2010

Geological investigation for Donglingxin landslide deposit in Sanbanxi reservoir area

Excellent

Aug. 2010

Geotechnical engineering investigation for dangerous slopes at right abutment of Huanglongtan HPP

Good

Apr. 2011

Geological investigation for geological disaster control project at Bawai host area at Luofu Township of Nandan County for Longtan HPP

Good

2

Survey and design for geological disaster treatment

Aug. 2012

Survey and design for slope treatment for Group 2 of Tangfang Village in Xiangjiaba reservoir area

Good

Aug. 2012

Survey and design for Changmeihao landslide treatment in Xiangjiaba reservoir area

Excellent

Aug. 2012

Survey and design for Zhaojiawan landslide treatment in Xiangjiaba reservoir area

Good

Aug. 2012

Survey and design for Halaowo landslide treatment of Dongyuemiao in Xiangjiaba reservoir area

Good

Oct. 2012

Survey and design for slope treatment at Yongshan Cement Plant in Xiangjiaba reservoir area

Excellent

Nov. 2012

Survey and design for treatment of dangerous rocks on slope at access road to Dongjiang HPP

Good

3

3

Design for geological disaster control

Design for geological disaster control

May 2009

Preliminary design for geological disaster control of the area downstream of dam site for Jiangpinghe HPP on the Loushui River in Hubei

Good

Aug. 2009

Calculation of physical indicator compensation cost for Longping Primary School No. 4 impacted by bank geological disaster in Luodian reservoir area for Longtan HPP

Good

Aug. 2009

Survey and design for high cutting slope treatment at Jinping Town of Pingshan County, Sichuan

Excellent

Dec. 2009

Design of Zhangjiagou landslide treatment project for Phase I channels of Yulanzui Water Works at Qijiang County, Chongqing

Good

Apr. 2010

Special topic design of Phase III resettlement implementation plan for landslide and bank collapse of Sanbanxi Reservoir

Good

June 2010

Cut slope geological and protection consultation for Guiwu Expressway, Hunan

Excellent

July 2010

Phase V geological investigation and resettlement investigation for landslides and bank collapse of Sanbanxi Reservoir and design of Donglingxin and other 4 deformation slopes

Good

Aug. 2010

Preliminary design of slope treatment project for Huanglongtan HPP

Excellent

Oct. 2010

Special topic design of Phase IV resettlement implementation plan for landslides and bank collapse of Sanbanxi Reservoir

Good

Nov. 2010

Cut slope geological and protection consultation for Chenning Expressway, Hunan

Good

Aug. 2011

Preliminary design of geological disaster control works for Bawai host area at Luofu Township of Nandan County

Excellent

Sept. 2011

Design of Phase 2 resettlement implementation plan for bank geological disaster in Wangmo reservoir area for Longtan HPP

Good

4

4

Geological disaster risk assessment

Geological disaster risk assessment

June 2008

Geological disaster risk assessment for site of Employer’s Camp of Tuokou HPP at Hongjiang City, Hunan

Grade II

Aug. 2008

Geological disaster risk assessment for residential area of Sanli Village for Tuokou HPP at Hongjiang City, Hunan

Grade II

Aug. 2008

Geological disaster risk assessment for highway rehabilitation from diversion dam at powerhouse to relocated site of Tuokou Town for Tuokou HPP at Hongjiang City, Hunan

Grade II

Sept. 2008

Geological disaster risk assessment for Ganjuyuan residential area for Tuokou HPP at Hongjiang City, Hunan

Grade II

Sept. 2008

Geological disaster risk assessment for Canzijie residential area for Tuokou HPP at Hongjiang City, Hunan

Grade II

Jan. 2010

Geological disaster risk assessment for site of Taoyuan HPP on Yuanshui River, Hunan

Grade I

Aug. 2010

Geological disaster risk assessment for site of Wuxing Primary School at Shulou Town of Pingshan County in Sichuan in Xiangjiaba reservoir area

Grade I

Sept. 2010

Geological disaster risk assessment for site of Lazi Primary School at Shulou Town of Pingshan County in Sichuan in Xiangjiaba reservoir area

Grade I

Sept. 2010

Geological disaster risk assessment for site of Liuyiwu Primary School at Jinping Town of Pingshan County in Sichuan in Xiangjiaba reservoir area

Grade I

Sept. 2010

Geological disaster risk assessment for site of Jinjiang Primary School at Jinping Town of Pingshan County in Sichuan in Xiangjiaba reservoir area

Grade I

Nov. 2010

Geological disaster risk assessment for Xidazhuang host area for Tianchi PSPS in Henan

Grade I

Nov. 2010

Geological disaster risk assessment for Liziyuan and Wopeng host areas for Wuyue PSPS in Henan

Grade I

Dec. 2010

Geological disaster risk assessment for 48MW Luhejin Wind Farm at Chenzhou, Hunan

Grade II

May 2011

Geological disaster risk assessment for site of irrigation works for Taoyuan Reservoir in Guiyang County, Hunan

Grade I

June 2011

Geological disaster risk assessment for new site of Dukou Village and Dukou wastewater treatment plant at Dukou Township, Leibo County, Sichuan

Grade I

June 2011

Geological disaster risk assessment for host area of Group 3, Jinya Village, Xin’an Town, Pingshan County, Sichuan in Xiangjiaba reservoir area

Grade I

June 2011

Geological disaster risk for host area of Nansheng Village, Lizhuang Town, Cuiping District, Yibin City, Sichuan in Xiangjiaba reservoir area

Grade I

June 2011

Geological disaster risk assessment for host area of Xinni Village, Nixi Town, Yibin County, Sichuan in Xiangjiaba reservoir area

Grade I

June 2011

Geological disaster risk assessment for Yachi host area of Yicun Village, Yachi Town, Pingshan County, Sichuan in Xiangjiaba reservoir area

Grade I

June 2011

Geological disaster risk assessment for host area of Group 8 of Shulou Village, Shulou Town, Pingshan County, Sichuan

Grade I

June 2011

Geological disaster risk assessment for water supply project site for new site of Dukou Township, Leibo County, Liangshan Prefecture, Sichuan in Xiangjiaba reservoir area

Grade I

July 2011

Geological disaster risk assessment for Qiongzhong PSPS in Hainan

Grade I

Aug. 2011

Geological disaster risk assessment for 48MW Qiaoshi Wind Farm at Chenzhou, Hunan

Grade I

Aug. 2011

Geological disaster risk assessment for 28MW Laixi Wind Farm at Chenzhou, Hunan

Grade I

Feb. 2012

Geological disaster risk assessment for Taohuashan Wind Farm at Huarong of Yueyang

Grade II

April 2012

Geological disaster risk assessment for Shilipingtan Wind Farm at Chengbu of Shaoyang

Grade II

May 2012

Geological disaster risk assessment for Shiwangutian Wind Farm at Chengbu of Shaoyang

Grade II

Aug. 2012

Geological disaster risk assessment for Zijingshan Wind Farm at Xupu of Huaihua

Grade II

Sept. 2012

Geological disaster risk assessment for Shijiaping Wind Farm at Chengbu of Shaoyang

Grade II

5

EPC contracting for geological disaster control projects

Jan. 2011

Right abutment slope treatment project for Huanglongtan Dam (EPC contracting for survey, design and construction

Excellent

Sept. 2011

Newly added works for right abutment treatment of Huanglongtan Power Plant(EPC contracting for survey, design and construction)

Excellent