PRODUCTS

Position:Home > PRODUCTS > Present

SonLa HPP in Vietnam

  Located in Son La Province, north of Vietnam, Son La HPP has a total installed capacity of 2400MW and is known as a Three Gorges Project in Vietnam. The total investment of the project is 2.3 billion USD. The project will be installed with six units and has a design annual output of 10,000 GWh. The first unit will be put into service by the end of 2010. We are responsible for the design and supply of BOP electromechanical equipment.
  The total investment of the project is 2.3 billion USD, the design annual output 10,000 GWh, and the annual revenue from electricity sells up to 400 million USD. The first unit is scheduled to be put into service by the end of 2010. The subcontract for electro-mechanical equipment design was signed on October 12, 2007. Tianjin Alstom Hydro Co. Ltd. is in charge of the design and supply of electromechanical equipment, and Hydrochina Zhongnan Engineering Corporation is responsible for the design, supply and on-site technical service of BOP electromechanical equipment, covering procurement, shop test, package and transportation, installation supervision, commissioning, field test, and trial run of BOP equipment and materials, warranty service, and training to the Buyer’s personnel.